Our Projects

Kinect at Shoreline

New 240-unit, Class A, four-story, multi-family development with 2006 sq/ft of ground floor retail and 285 parking spaces. In Progress

Kinect at Burien

A new 230-unit, Class A, mid-rise multi-family development for American Home Builders. Completed May 2023

Seattle Lighting

Fireline and new fire hydrant for Abbott Construction. Completed February 2023

 

Big 1410 - Howell Street Apartments

Earthmoving, Sewer main, domestic waterline, fireline, storm connection, exterior walks and planters subgrade work, SCL vault.

North Shore School District

Various locations – T&M Earthwork

Olympic Ridge Habitat

Foundation demolition, mass excavation/footing excavation, storm water system, and pump stations (Sewer, storm & footing pumps)

Monarch Boutique

Scope of work:

Instal new fire line from main to the building, dig out building slab, footings and backfill, Install cap break, and install electrical vault.

Small Sewer Repair

This is a sewer main repair at West Armory Way at the Michael’s building for K Contracting.

Small Grading Job

Here are some good pictures of a recent small grading job we did.

The FIRS, Fire Line Installation, Lacey, WA

Installation of fire line in the City of Lacey, Washington

1515 Dexter, Pipe and Fire Line Installation

1515 DEXTER, 30″ squash pipe and 6″ fire line installation.   
                   

Parkwood Plaza Storm Work Upgrades

First commercial job for Parkwood Plaza storm work upgrades.

Moses Lake Electrical Dig For Berg Electric

We did an electrical dig in Moses Lake for Berg Electric

 

Anderson Park Hotel

Anderson Park Hotel in Redmond PSE power duct plus 5′ x 7′ x 7′ vault.

 

Cap 11 Waterline Work

Cap 11 waterline work, fireline, domestic water, irritation water, storm drain work also included.        

John and Sam's House

Installed 250 feet of retaining wall block, cut out the back yard and filled in the front to level his yard out and placed topsoil.