Our Projects
Kinect at Shoreline
New 240-unit, Class A, four-story, multi-family development with 2006 sq/ft of ground floor retail and 285 parking spaces. In Progress
Kinect at Burien
A new 230-unit, Class A, mid-rise multi-family development for American Home Builders. Completed May 2023
Big 1410 - Howell Street Apartments
Earthmoving, Sewer main, domestic waterline, fireline, storm connection, exterior walks and planters subgrade work, SCL vault.
North Shore School District
Various locations – T&M Earthwork
Monarch Boutique
Scope of work:
Instal new fire line from main to the building, dig out building slab, footings and backfill, Install cap break, and install electrical vault.
Small Sewer Repair
This is a sewer main repair at West Armory Way at the Michael’s building for K Contracting.
Small Grading Job
The FIRS, Fire Line Installation, Lacey, WA
Installation of fire line in the City of Lacey, Washington
1515 Dexter, Pipe and Fire Line Installation
1515 DEXTER, 30″ squash pipe and 6″ fire line installation.
Parkwood Plaza Storm Work Upgrades
Moses Lake Electrical Dig For Berg Electric
We did an electrical dig in Moses Lake for Berg Electric
Anderson Park Hotel
Anderson Park Hotel in Redmond PSE power duct plus 5′ x 7′ x 7′ vault.
Cap 11 Waterline Work
Cap 11 waterline work, fireline, domestic water, irritation water, storm drain work also included.