Kinect at Shoreline
Scope of Work:
SCL Duct Bank and Communication Trenching in accordance with Seattle City Light drawing/specs, duct bank excavation, shoring, conduit forming, temp asphalt restoration, water demo cut and cap, relocate Comm Vaults.
This first image shows the work being done on the east side of the building showing the I-5 on one side and the side streets that we are working against (east side and north side (on the left and bottom right).